Cork House is unique; it is the built form of a radical new approach to construction and sustainable design. The architects, Matthew Barnett Howland, Dido Milne and Oliver Wilton, set out to re-think a building from first principles, considering each stage of its life, including whole-life carbon, material life-cycle and design for disassembly. They examined alternatives to the complex assemblies of composite materials which make up modern wall systems. Could a single solid material be used as an alternative? Their research led them to expanded cork, a bio-renewable material with a remarkably sustainable life cycle. In its solid form, it integrates structure, insulation, external and internal finish.

The walls and the five corbelled roof pyramids of Cork House are made of monolithic cork blocks, solid from inside to outside, which interlock so they can be built without mortar, glue, insulation, plaster or render. The system is carbon negative, designed for self-build assembly, and at the end of the building’s life the cork can be re-used.

It is an innovative building, but one which also had to respect the idyllic and historic context of its site. Its home is the riverside garden of a Grade II listed 19th century mill house, purchased a decade ago by Howland and Milne, who became not only architects but also clients and builders. The house nestles amid mature trees and acts as a gateway into a walled garden. It is linear in plan, 18 metres long, and consists of five bays, each topped with a pyramidal roof. The cork blocks which form the pyramidal roofs are clad with cedar weatherboards and rainwater is discharged via copper-lined valleys and copper rainwater goods.

The first bay, the threshold between the two gardens, creates a space for sheltered outside living; the next bay is an entrance foyer and a generous bathroom with a sleeping loft above it. Two further pyramidal roofs enclose a kitchen/living room, with a bedroom in the final module beyond. Inside the house, the exposed cork walls are warm to the touch and create a rich sensory environment involving touch, sound and even smell.

As the architect explains: ‘The resultant architectural form is new and yet familiar, a progressive reimagining of ancient structures and simple construction principles that considerably exceeds contemporary building performance requirements. With a focus on what is solid, simple and sustainable, the project is also an innovative response to some of the complexities and conventions of modern building practices’.

The use of cork

Expanded cork is a material with a unique and traditional ecological origin. Mediterranean cork oak forests, grown for centuries to make wine stoppers for local vinyards, are landscapes which are rich in biodiversity. The bark of the cork oak is harvested every nine years without felling or harming the trees or disturbing the forest. Expanded cork is manufactured from the waste product of the harvest. In addition, expanded cork has superb thermal performance, is excellent in compression and is entirely bio-renewable.

The Cork House project utilised an evolved version of a cork construction system researched and developed from 2015 to 2018 by MPH Architects, the Bartlett School of Architecture UCL, University of Bath, Amorim UK and Ty-Mawr, with subcontractors including Arup and BRE. The research explored design hypotheses and prototypes, and built constructional models to scale. A robotic milling technique was developed at the Bartlett to shape the cork blocks. Test panels were laboratory-tested to address a range of performance criteria, with the University of Bath focusing on structural testing and BRE undertaking fire performance and rain tightness testing. A small prototype building was created and monitored to help establish performance through the seasons under real weather conditions.

The research was part-funded by Innovate UK and EPSRC under the 2015 Building Whole Life Performance funding competition. It established the viability of the cork construction system for a range of applications, and de-risked the system sufficiently for application on its first live project.

Construction

The construction was designed as a prefabricated kit-of-parts. The blocks of expanded cork (1,268 of them) were CNCmachined off-site using a digital machine cutting process that could produce a block every five minutes. The blocks are generally one metre x 500mm in size and light enough to be assembled on-site by hand. They are profiled so that they interlock in both plan and section with friction-fit joints, without the use of mortar or glue. The blocks are supported at ground floor level on an Accoya ring beam and spruce cross-laminated timber (CLT) floor panels which, in turn, transfer all loads to 14 removeable steel screwpile foundations.

The cork wall structure is in pure compression and all lateral loads are taken through an Accoya ring beam and valley beams, both integrated into the cork block structure at eaves level. Accoya lintels combine with the eaves ring beam to form a U-beam over window and door openings.

The five quadrilateral pyramid roofs were made using the same principles of interlocking joints, but each block is corbelled in from the one below, creating a series of five truncated pyramids, each surmounted with a triple-glazed rooflight fixed to an Accoya frame. Accoya is used for structural beams, windows, doors and steps, and two sets of smaller Accoya ring beams are incorporated into each roof pyramid to stiffen the centre of the roof planes, providing support during assembly without falsework, and regulating the roof geometry.

The CLT floor panels are finished with unplaned cross-sawn oak floorboards (screwed rather than nailed for ease of disassembly). All internal built-in joinery is made from spruce Tilly board and loose furniture is made from reclaimed spruce CLT boards.

Extensive testing resulted in minor modifications. To improve airtightness, a 10mm rebate for a removable foam insert was incorporated into the joints, and the external sloping surfaces of the cork corbels which create the pyramids were lined with western red cedar weatherboards, which drain rainwater into copper-clad valleys between the pyramids and discharge into a series of copper gutters. As part of the fire engineering scheme, Class 0 fire-rated western red cedar was used to line the rear façade externally, and sprinklers were installed internally to avoid any internal coating or lining of the cork.

The cork blocks and all other connections are mechanical and accessible, and the whole house is ‘designed for disassembly’ so that the cork can be re-used at the end-ofbuilding- life as either biological or technical nutrients. This innovative and radically simple form of biogenic construction is carbon negative at completion and has exceptionally strong whole-life performance including estimated whole-life carbon emissions of 618kg CO² eq/m².

Awards

RIBA Stirling Prize shortlist 2019

RIBA Stephen Lawrence Prize 2019

RIBA National Award 2019

RIBA South Sustainability Award 2019

RIBA President’s Awards for Research 2019 Shortlist

The Manser Medal – AJ House of the Year Shortlist

The Wood Awards Gold Winner 2019

The Wood Awards Private Winner 2019

Completion Date:

January 2019

Building Type:

Private house

Location:

Eton, Berkshire

Architect:

Matthew Barnett Howland with Dido Milne and Oliver Wilton

Executive Architect:

MPH Architects

Client:

Matthew Barnett Howland and Dido Milne

Structural Engineer:

Arup

M & E Consultant:

Arup (Fire)

Main Contractor:

Matthew Barnett Howland assisted by M&P London Contractors

CNC Machining:

Wup Doodle, Norfolk

Joinery:

Whyte and Wood. Nic Rhode Furniture, Tom Graham Workshop

Timber Supplier:

NFP Europe Ltd

Timber Elements:

Structure, walls, floor, pyramid roofs, windows, doors, internal joinery

Timber Species:

PEFC- and FSC-certified Western red cedar, spruce CLT, American white oak, Cradle to Cradle Gold Certified Accoya (Radiata Pine). Cork oak bark (Quercus Suber), Portugal

Register to download the full case study with images and architectural drawings

Register

Suggested Reading

Timber design pioneers: tackling the sustainability challengenavigation-arrow

Timber design pioneers explores how collaboration can drive innovation in design and construction.

 

Chapter 4, Tackling the sustainability challenge, features three very different and remarkable projects:

  • Cowan Court, Churchill College
  • Rievaulx Abbey Visitor Centre
  • New Islington

 

Chapter 4 includes interviews with:

  • Tom Emerson, 6a architects
  • ...

28/08/2019

Procuring engineered timber buildings: A client's guidenavigation-arrow

Procuring engineered timber buildings: A client's guide highlights the important questions developers and other clients need to consider when reviewing the merits of engineered timber solutions for the structure of their building. The publication will assist TRADA members in providing answers to the following questions and may be shared with...

30/05/2019

Structural fire design: Statement on the design of cross-laminated timbernavigation-arrow

Included on the TRADA website by permission of the Civil Engineering Research Journal, Juniper Publishers and the authors.

 

This document was prepared in response to comments about cross-laminated timber (CLT) in journals, online press and lobby documents that highlighted “inconsistencies” of the product...

24/05/2019