Home Links About us Contact us Careers  

You are not currently signed in

REGISTER FOR FREE ACCESS SIGN IN
Technical Information
Regulations & Codes
Case Studies
Membership
Bookshop
Training
News
Suppliers Directory
Commercial Services
FAQs

Timber frame construction > Walls


 1-5 of 5 

Acoustic performance in residential timber frame developments

Publisher: TRADA Technology Ltd
Publication date: 0
Format: HTML Document
Access Required: Free Registration

Register for free access now

This Wood Information sheet discusses the sound insulation requirements of the building regulations in various parts of the United Kingdom, the basic principles of design, and focuses on how to achieve all of this on site.


Acoustic performance in residential timber frame developments

Publisher: TRADA Technology Ltd
Publication date: 0
Format: PDF Document
Access Required: Member


Join TRADA today

This Wood Information sheet discusses the sound insulation requirements of the building regulations in various parts of the United Kingdom, the basic principles of design, and focuses on how to achieve all of this on site.


Breather membranes for timber frame walls

Publisher: TRADA Technology Ltd
Publication date: 2003
Format: HTML Document
Access Required: Free Registration

Register for free access now

Breather membranes timber frame walls design details


Breather membranes for timber frame walls

Publisher: TRADA Technology Ltd
Publication date: 2003
Format: PDF Document
Access Required: Member


Join TRADA today

Outlines the application and performance of specialist breather membranes for timber frame walls


Timber frame walls and floors: Fire resistance of service penetrations

Publisher: TRADA Technology Ltd
Publication date: 2001
Format: HTML Document
Access Required: Free Registration

Register for free access now

Most loadbearing elements have some form of service penetration into or through them. This report presents the results of reduced-scale fire resistance tests to BS 476-22 on timber frame external and internal walls and intermediate floors of 30 and 60 minute fire resistance and a 60 minute compartment floor. Penetrations included electrical socket outlets and switch boxes, copper and plastic pipes, ceiling light drops and downlighters.


 1-5 of 5 
                                       
  Site map Terms & conditions Privacy policy

© and Database Rights TRADA and TTL Chiltern 2002 - 2006. All Rights Reserved

Interbuild 2008
FREE CPD programme 2008  - sponsored by Wood for good
wood for gold
Waterfront 1st July 2008, Bircham Dyson Bell, London