News
July 18, 2008
Part E - higher acoustic performance requirements ahead?

Although acoustic requirements in Part E
Resistance to the Passage of Sound of the England & Wales Building Regulations have increased in recent decades, the number of complaints about noise continues to rise. Requirements therefore are likely to increase further, as TRADA's latest
Construction Briefing highlights.
The scope of Part E is limited to dwellings and schools. With respect to dwellings the main emphasis is on:
- Noise reduction between dwellings and within dwellings
- Control of noise reverberation in the common internal parts of buildings containing flats or rooms for residential purposes.
TRADA Regulations Consultant Rupert Scott said, ‘With government's strong emphasis on thermal performance, designers and product manufacturers are seriously revisiting how to improve performance in this regard, in some cases going right back to basics. It is important to consider the impact of this on other performance areas, including acoustics. Generally, better thermal performance leads to increased acoustic performance, but not always.'
However, the Code for Sustainable Homes (CSH) offers very generous voluntary points for providing sound reduction levels over and above those set in Part E, with an 8dB improvement attracting nearly 5 percentage points at the time of writing. Mr Scott added. ‘This is clear evidence that the government recognises that home dwellers would appreciate considerably higher levels of performance than the minimum currently set. Future changes, in TRADA's view, are only likely to be upwards.'
Prior to 2003, proving the actual acoustic performance on site was not necessary - laboratory results for generic details or specific products was acceptable. However, many buildings have achieved lower levels of performance in reality, because of poor workmanship on site. ‘Consequently the effect of requiring proof of performance has raised actual performance without needing to raise the levels set.'
For separating elements, two methods of proving performance have been approved, pre-completion testing (PCT) and using Robust Details Limited (RDL)-approved details. These will be discussed further in a future TRADA Construction Briefing.
To view the TRADA Construction Briefing on Part E click here
Recent Stories:
News stories are listed in order of relevence.
|
November 28, 2008 |
Ideal Christmas presents from TRADA & Christmas opening times |
|
|
New External Timber Weathering Resource Pack |
|
|
TRADA looks at ‘Corporate Social Responsibility’ |
|
November 27, 2008 |
New titles added to the TRADA Bookshop |
|
November 21, 2008 |
TRADA tackles weathering and its significance for specifiers |
|
November 20, 2008 |
Andira, imbiua, movingue and piqua: now online |
|
November 19, 2008 |
Housing policy embraces Lifetime Homes requirements |
|
November 18, 2008 |
Historic buildings event highlights need to know more |
|
November 17, 2008 |
frameCHECK repackages timber frame training courses |
|
November 14, 2008 |
TRADA and wfg CPD seminars – places still available |
|
November 13, 2008 |
TRADA Technology sets 2009 dates for timber grading course |
|
November 12, 2008 |
TRADA celebrates success at Interbuild |
|
November 11, 2008 |
NEW case study: sustainable housing in Somerset |
|
November 10, 2008 |
TRADA ‘hands on’ EC5 workshops highly praised |
|
November 6, 2008 |
Calling young researchers! |
|
October 17, 2008 |
Standards updates for members - October |
|
October 16, 2008 |
Interbuild: generous discounts from TRADA |
|
October 15, 2008 |
Engineered wood products explained and in use |
|
October 13, 2008 |
Wood Futures conference – the zero carbon challenge |
|
October 10, 2008 |
NEW: Timber Solutions – timber/steel retail structure |